PROJECT SELECTION GUIDE

Start with the charging mode, then confirm the electrical rating, cable configuration, operating environment, and charger-side integration requirements.
Project Type Selection Focus Key Questions Information to Prepare
DC fast charging equipment Rated current and voltage, charging profile, cable specification, and temperature monitoring What operating current, charging duty cycle, cable length, and ambient conditions must the connector support? Charger output, charging profile, required cable length, installation layout, and target certification
AC charging equipment Rated current and voltage, cable length, cable entry, and equipment configuration What AC rating is required, and how will the cable assembly connect to and route from the EVSE? Electrical rating, cable length, EVSE drawing or cable-entry details, and target certification

leave a message

leave a message
If you are interested in our products and want to know more details,please leave a message here,we will reply you as soon as we can.
  • Attach Files
Contact us:info@workersbee.com